DEPOSITS
| 1. Residential: |
Home & land owned - $70.00 |
| |
|
| |
Rental & leased - $160.00 |
| |
|
You must come by in person to apply for Residential Service |
|
| |
| 2. Commercial & Industrial: |
1 times’ highest monthly bill ($100.00 minimum) and a power contract are required for services 50 KW and above. |
| |
|
For Commercial Service, see the application below: |
| |
|
| TUPELO OFFICE (662) 842- 7635 |
FULTON OFFICE (662) 862 -3146 |
| P.O. DRAWER 1789 |
P.O. BOX 369 |
| TUPELO MS 38802 |
FULTON MS 38843 |
| FAX (662) 844-9045 |
FAX (662) 862-4089 |
| LOCATED: 1906 S GLOSTER |
LOCATED: 813 W MAIN |
|
SERVICE FEES
| 1. |
Initial connection fee |
|
$10.00 |
|
| 2. |
Transfer of service |
|
$10.00 |
|
| 3. |
Temporary Electric Service |
|
$21.00 |
|
| 4. |
Returned Check |
|
$20.00 |
|
| 5. |
Re-connection for meter pulled
for non-payment |
|
|
|
| |
a. Collection fee |
|
$10.00 |
|
| |
b. During work hours |
|
$25.00 |
|
| |
c. After hours(3:30 P.M.)
weekends & holidays |
|
$50.00 |
|
| 6. |
Meter test |
|
$25.00 |
(refunded if bad) |
| 7. |
Meter tampering |
1st |
|
$50.00 |
+ est. usage* |
| |
2nd |
|
$100.00 |
+ est. usage* |
| |
3rd |
|
$500.00 |
& possible jail time.* |
| |
*Plus any damage to equipment. |
|
|
|
RATES
Effective June 1, 2013
| Residential |
|
|
| |
Customer charge |
$12.11 |
| |
KWH |
$0.09533 |
| |
|
|
| General Power – Commercial |
|
| |
|
|
| |
GSA -1 (less than 50 KW) |
|
| |
Customer charge |
$22.00 |
| |
1st 300 kwh |
$0.11778 |
| |
Additional kwh |
$0.10685 |
| |
|
|
| |
GSA-2 (51-1000 KW) |
|
| |
Customer charge |
$110.00 |
| |
kW, 51-1,000 |
$13.34 |
| |
1st 15,000 kwh |
$0.10342 |
| |
Additional kwh |
$0.06545 |
| |
|
|
| |
GSA-3 |
|
| |
Customer charge |
$425.00 |
| |
kW, 0-1,000 |
$12.09 |
| |
kW, 1,001-5,000 |
$12.08 |
| |
All kwh |
$0.06848 |
| |
|
|
OUTDOOR LIGHTING (monthly charges)
| |
a. |
100 High Pressure Sodium |
$7.19 |
| |
b. |
175 Mercury Vapor |
$7.98 |
| |
c. |
250 Watt HPS Cobrahead |
$12.45 |
| |
d. |
400 Watt HPS Cobrahead |
$17.68 |
| |
e. |
400 Watt FLOOD |
$21.68 |
| |
|
|
|
| There is a fuel adjustment cost that changes every quarter that is controlled by our
wholesale distributor, TVA. |
WHATS NEEDED FOR DEPOSIT
BUYING HOME
Two forms of identification.
State issued ID or driver license
Social Security card
Check stub, W2 form, original birth certificate
Correct 911 address(house number & street/road)
Correct mailing address
$70.00 deposit
RENTAL PROPERTY
The same as above but with rent receipt or lease agreement and the deposit is $160.00.
MOBILE HOME REQUIREMENTS
Registration number from the county the mobile home is located. (Doublewide or single wide)
Lee County Board of Supervisors requires a permit.
Singlewides require a $50.00 construction cost.
Doublewides require a $50.00 construction cost, unless metered on the home and homeowner also owns the property.
|